
I'm so ready for fall to be here so we can get started on our house. Today didn't help my longing to be working on it. The muffled sound of a chainsaw buzzing, the smell of 2cycle engine oil burning, the smell of fresh cut red oak, the feel of the chainsaw in my hands "Oh" Sorry about that, I was getting a little carried away. :) My wife often says one day she's going to come in smelling like saw dust to get my attention.
On a serious note, I'm looking forward to the Log and Timber Home Show coming to Atlanta Sept. 21-23. This will give me a chance to talk to some of the company rep. face to face, like prema-chink and others.
Within the next month I hope to send our plan ideas to Dirkson Design Services or R.C.M. Cad Design Drafting Ltd. In about a month or so it should start cooling down enough. Then I can start planing and treating logs. Can't wait!